Facility siding prior to installation
|
|
 |
|
Survey to design correct slope for piping
|
|
 |
|
Excavation 1
|
|
 |
|
Excavation 2
|
|
| |
 |
|
Early stage pipe installation 1
|
|
 |
|
Early stage pipe installation 2
|
|
 |
|
Pan installation 1
|
|
 |
|
Pan installation 2
|
|
| |
 |
|
Pan installation 3
|
|
 |
|
Pan installation 4
|
|
 |
|
Connect pipes to Pans 1
|
|
 |
|
Connect pipes to Pans 2
|
|
| |
 |
|
Connect pipes to Pans 3
|
|
 |
|
Connect pipes to Pans 4
|
|
 |
|
Connect pipes to Pans 5
|
|
 |
|
Connect pipes to Pans 6
|
|
| |
 |
|
Gasket installation 1
|
|
 |
|
Gasket installation 2
|
|
 |
|
Pan customization (if needed)
|
|
 |
|
Late stage installation 1
|
|
| |
 |
|
Late stage installation 2
|
|
 |
|
Connect pipes to sump
|
|
 |
|
Hydrotesting 1
|
|
 |
|
Hydrotesting 2
|
|
| |
 |
|
Backfilling
|
|
 |
|
Finished installation
|
|
|
|