Ultra-TrackPans® -
Installation
|
|
Installation
Is Simple! Lightweight TrackPans can be easily installed without
heavy lifting equipment, i.e. forklifts, cranes, backhoes, etc. Minimal
tools and labor required. |
|
|
|
|
|
|
Flow-through channels - All pans are connected
"end to end" with bulkhead fittings, and a 3-inch diameter
flow-through channel, allowing spills to flow from one Pan to the next.
Containment capacity is increased as the spill travels from TrackPan to TrackPan.
|
|
Closed-cell, polyethylene gaskets are then
installed to complete the seal. (gaskets are provided)
|
|
Side Pans are secured in place with rebar or other
fasteners. (2-foot-long rebar fasteners with protective caps are available
as options.)
|
|
|
|
|
|
|
|
Download Ultra-TrackPan Installation
Instructions
Download Instructions on
how to flame weld gaskets